Summary
of Hawaii 3R's Projects
|
H3R's Proj. #
|
School Name |
General Description of Main Project Areas |
H3R's Grant Award
|
|
01 01
|
Wahiawa Middle |
Interior painting of Buildings A, D, F, G, H |
$14,000 |
|
01 02
|
Kapunahala Elementary |
Restoration of electrical system |
$25,000 |
|
01 03
|
Baldwin High |
Interior painting and electrical outlet installation in several
portables |
$23,500 |
|
01 04
|
Roosevelt High |
Repair Physical Education Locker Rooms/Facility |
$25,000 |
|
01 05
|
Waianae Intermediate |
Exterior painting of Buildings A, F |
$25,000 |
|
02 01
|
Kalihi-Waena Elementary |
Exterior painting of Buildings C, D |
$25,000 |
|
02 02
|
Kauai High |
Exterior painting of Building Z |
$2,900 |
|
02 03
|
King Kaumuali'i Elementary |
Exterior painting of 4 portables |
$4,800 |
|
02 04
|
Lahainaluna High |
Handrail installation on Buildings J, I; upgrade football
field lights |
$25,000 |
|
02 05
|
Moanalua Middle |
Exterior painting of Building I (Cafeteria) |
$15,000 |
|
02 06
|
Nanakuli Elementary |
Exterior painting |
$24,000 |
|
02 07
|
Waimalu Elementary |
Exterior painting of Building E, minor concrete repairs |
$25,000 |
|
02 08
|
Wilson Elementary |
Re-carpet Building E (Library) |
$11,000 |
|
03 02
|
Kailua Intermediate |
Exterior painting of Cafeteria |
$21,500 |
|
03 04
|
Kapunahala Elementary |
Interior painting of Building A, B; drainage improvements;
replace dining room lights, walkway lights |
$51,000 |
|
03 05
|
Kaunakakai Elementary |
Install security screens on Building C |
$25,000 |
|
03 06
|
King Kamehameha III Elementary |
Exterior painting of Portables 14, 17; roof painting of Buildings
A, D; carpeting Building E, Portables 11, 16 |
$29,350 |
|
03 07
|
Kipapa Elementary |
Exterior painting of Buildings A, J, L |
$45,200 |
|
03 08
|
Moanalua Middle |
Interior painting of Building F, K |
$25,300 |
|
03 09
|
Puuhale Elementary |
Exterior painting of Building A; encapsulate transite panels |
$28,100 |
|
03 10
|
Shafter Elementary |
Interior painting of Buildings A, B, C, E |
$46,700 |
|
03 12
|
Waiakea Elementary |
Exterior painting of Portables 14, 17; roof painting of Buildings
A, D; carpeting Building E, Portables 11, 16 |
$18,000 |
|
03 13
|
Waiakea Waena Elementary |
Exterior painting of Building I (Cafeteria) |
$21,000 |
|
03 14
|
Waimalu Elementary |
Exterior painting of Building E; structural repairs |
$50,000 |
|
03 15
|
Wheeler Elementary |
Interior painting of 2 classrooms |
$20,000 |
|
03 16
|
Wheeler Middle |
Exterior painting of Building E |
$42,000 |
|
04 01
|
Pearl Harbor Kai Elementary |
Exterior painting of Buildings A, B, C, D, E, H, I, covered
walkways |
$70,000 |
|
04 02
|
Mililani Uka Elementary |
Exterior painting of three portables |
$5,850 |
|
04 03
|
Kipapa Elementary |
Exterior painting of Buildings C, D |
$51,816 |
|
04 04
|
Aliamanu Elementary |
Bathroom renovation |
$60,000 |
|
04 06
|
Kaimuki High |
Interior and exterior painting of Building N |
$19,100 |
|
04 07
|
Leilehua High |
Interior painting of 5 portables; replace walkway |
$30,000 |
|
05 01
|
Eleele Elementary |
Interior painting of Library, Library Workroom and Library
Office |
$4,043 |
|
05 02
|
Puuhale Elementary |
Exterior painting of Building D |
$15,100 |
|
05 03
|
Waiahole Elementary |
Exterior painting of Buildings D, F, G, Portables 1, 2 |
$27,000 |
|
05 04
|
Hickam Elementary |
Transforming Quonset Hut into Multi-Purpose Facility |
$50,000 |
|
05 05
|
Mililani Waena Elementary |
Interior painting of Building D |
$26,000 |
|
05 06
|
King Kamehameha III Elem. |
Interior painting of Buildings C, E bathrroms, metal roof
repainting of Building B, C, E |
$11,500 |
|
06 01
|
Aliiolani Elementary |
Resurfacing Two Parking Lots |
$50,000 |
|
06 02
|
Kaimuki High |
Exterior painting of Cafeteria, Swimming Pool Building, Music
Building; Replace Windows/Security Screens on Building M |
$60,000 |
|
06 03
|
Kaiser High |
Exterior/interior painting of Cafeteria, exterior painting
of Locker Rooms |
$50,000 |
|
06 04
|
Blanche Pope Elementary |
Exterior painting of Buildings A, B |
$60,000 |
|
07 01
|
Aliamanu Middle |
Repaint interior/replace flooring of Library |
$19,300 |
|
07 02
|
Farrington High |
Resurface football field, install sprinkler system |
$50,000 |
|
07 03
|
Jefferson Elementary |
Resurface playcourt |
$9,300 |
|
07 04
|
Kaahumanu Elementary |
Recarpet 12 Classrooms |
$41,500 |
|
07 05
|
Mililani Uka Elementary |
Repaint 3 portables; recarpet Portables P-3, P-4, P-5, P-6,
P-7, D-4 |
$21,050 |
|
07 06
|
Mililani Waena Elementary |
Exterior painting of Portables P1, P2, P3, P4, P5, P6, P7,
P8, P9, P10, P11, P12 |
$29,200 |
|
07 07
|
Nanakuli Elementary |
Exterior painting of Cafeteria, replace stage curtains |
$20,300 |
|
07 08
|
Nanakuli High |
Replace Greenhouse |
$37,450 |
|
07 09
|
Nuuanu Elementary |
Replace Light fixtures in Buildings D, E, F, G, H, I, L,
M, N; Replace Lamps |
$51,114 |
|
07 10
|
Blanche Pope Elementary |
Exterior painting of Buildings C, D |
$47,650 |
|
07 11
|
Red Hill Elementary |
Install Electrical Outlets in Buildings B, C, D |
$50,000 |
|
07 12
|
Salt Lake Elementary |
Exterior painting of Cafeteria, Library, Teacher's Workroom,
Buildings C, D, Portables P1, P2, P3, P4 |
$57,200 |
|
07 13
|
Waipahu Intermediate |
Interior painting of Buildings C, M; exterior painting of
Building S |
$49,709 |
|
07 14
|
Maui Waena Intermediate |
Interior/exterior painting of Buildings 2184, 2185, 2186,
2187, 2221, 2222; Repaint fence |
$50,000 |
|
07 15
|
Kahakai Elementary |
Exterior painting of Building D, Exterior/Interior painting
of Cafeteria |
$57,000 |
|
07 16
|
Waiakea High |
Exterior painting of Buildings B, C, D, E, F, H, I, J, K,
L, M, Q, R, U |
$50,000 |
|
07 17
|
Kaunakakai Elementary |
Install security screens on Buildings A, F; Exterior painting
of Building I |
$53,000 |
|
08 01
|
Kalanianaole Elementary |
Repaint interior of Cafeteria and Building J |
$35,000 |
|
08 02
|
McKinley High |
Repaint exterior of Cafeteria |
$17,500 |
|
08 03
|
Mililani Middle |
Install gate/walkway, modify drainage, re-grade area, replace
door stops |
$7,250 |
|
08 04
|
Waihee Elementary |
Replace light fixtures in Building A, paint bus waiting area |
$12,500 |
|
09 01
|
Holomua Elementary |
Bldg D - Repaint Interior Hallways & Recarpet
Classrms |
$24,300 |
|
09 02
|
Kailua Intermediate |
Renovate Music Room |
$36,200 |
|
09 03
|
Kaimiloa Elementary |
Repaint Exterior of 15 Portables |
$36,000 |
|
09 04
|
Kekaha Elementary |
Install Irrigation System and Tree Trimming |
$49,700 |
|
09 05
|
Kihei Elementary |
Replace Irrigation Pump |
$5,800 |
|
09 06
|
Lokelani Intermediate |
Replace Irrigation Pump |
$5,800 |
|
09 07
|
Makakilo Elementary |
Repaint Exterior of 4 Large Classroom Buildings |
$53,900 |
|
09 08
|
Mililani High |
Demolition of A/C & Duct System, & Ceiling
Repair |
$6,000 |
|
09 09
|
Waiakeawaena Elementary |
Repaint Exterior of 2 Large Classroom Buildings |
$50,000 |
|
10 01
|
Aliamanu Middle |
Music & Band rooms - Replace tile & carpet,
repaint interior |
$22,000 |
|
10 02
|
Baldwin High |
Library - Paint interior |
$14,000 |
|
10 03
|
Holumua Elementary |
E Bldg. - Replace classroom carets, pain
interior hallways |
$27,600 |
|
10 04
|
Kahuku High |
Gym - Replace tile in foyer & office, paint
interior |
$20,000 |
|
10 05
|
Kea'au Middle |
Renovate Locker room |
$34,300 |
|
10 06
|
Mililani Middle |
Tint all windows campus-wide |
$25,000 |
|
10 07
|
Radford High |
Install retaining wall on football field |
$11,000 |
|
10 08
|
Gus Webling Elementary |
Install ADA walkway to playground equpment
and concrete pad |
$24,850 |
|
10 09
|
Wilson Elementary |
Bldg. C, D & F - Install security screens |
$35,000 |
|
11 01
|
Aiea El |
Install Sprinkler System |
8,300 |
|
11 02
|
Farrington High |
Repair Showers & Locker Rooms |
50,000 |
|
11 03
|
Kahuku
High & Int |
Replace Tile in Music Room, Foyer, Office |
11,200 |
|
11 04
|
Kaimuki High |
Expand Snack Shop Window & Repair Termite
Damage |
3,000 |
|
11 05
|
Keaau Middle |
Termite Treatment of Gym & Repair Termite
Damage |
18,000 |
|
11 06
|
Kipapa El |
Recarpet Library |
16,550 |
|
11 07
|
Lahainaluna High |
Retile Dormitory |
28,000 |
|
11 08
|
Lehua El |
Install Sprinkler System |
17,800 |
|
11 09
|
Leilehua High |
Repaint Interior of Gym & Related Rooms |
48,000 |
|
11 10
|
Makakilo El |
Repaint Exterior of 3 Buildings |
24,500 |
|
11 11
|
Manoa El |
Replace Window Hardware & Screens of Cafeteria |
58,000 |
|
11 12
|
Maui Waena El |
Repaint Interior & Exterior of Cafeteria, & Recarpet
Stage |
35,900 |
|
11 13
|
Mililani Uka |
Repaint Exterior of 2 Buildings |
31,000 |
|
11 14
|
Mililani Waena |
Repaint Int. of 12 Port., Retile Dining Rm, & Replace
Office Counters |
51,700 |
|
11 15
|
Solomon El |
Install Emergency Exit Doors & Landings for
2 Portables |
15,000 |
|
11 16
|
Waiakea High |
Repaint Exterior of 7 Portables |
20,500 |
|
11 17
|
Waialua El |
Replace Walkway & Install Concrete Slab |
16,000 |
|
11 18
|
Waimea El |
Repaint Exterior of 2 Buildings |
50,000 |
|
11 C1
|
Kainalu El |
Resurface & Restripe Playcourt, Replace Backboards,
Repair Fence |
27,000 |
|
11 C2
|
Lanikai El |
Replace Chain Link Fence |
6,500 |
|
11 C3
|
Pope El |
Recarpet and Retile |
21,000 |
|
11 C4
|
Waimanalo El |
Security fences and Gates |
670 |
|
12 01
|
Lahaina Int |
Install Sidewalk & Drainage Improvements |
17,300 |
|
12 02
|
Lahainaluna High |
Interior and Exterior Painting |
50,000 |
|
12 03
|
Maui High |
Interior and Exterior Painting |
37,000 |
|
12 04
|
Mauka Lani El |
Install ADA Sidewalk Curb Ramp |
1,500 |
|
12 05
|
Pearl City Highlands El |
Install Sprinkler System |
25,500 |
|
13 01
|
Aikahi El |
Portable 1 - Replace stairs & ramp |
3,250 |
|
13 02
|
Aliamanu El |
Install Security Screens on 3 Bldgs |
6,000 |
|
13 03
|
Aliamanu Middle |
Resurface floor w/Epoxy coating / Repaint interior |
16,300 |
|
13 04
|
Heeia El |
Recoat non-skid coating on 6 stairwells / restripe |
7,000 |
|
13 05
|
Jarrett Middle |
Recarpet & repaint Library / Repaint & repair
Music Rm |
46,500 |
|
13 06
|
Kalaheo High |
Demo CMU walls & footings / build CMU wall
/ Replace doors |
8,100 |
|
13 07
|
Kapunahala El |
Repaint library |
3,400 |
|
13 08
|
Kaunakakai El |
Bldgs A & F Repaint Int / Refinish Stage /
Recarpet |
33,500 |
|
13 09
|
Lihikai El |
Paint interior kitchen |
7,500 |
|
13 10
|
Mililani Mauka El |
Install Railings along walkway |
6,000 |
|
13 11
|
Waimanalo
El & Int |
Replace AC walkway w/concrete / Repair & Widen
Walkways |
16,000 |
|
13 12
|
Waimea Middle |
Paint Int & Ext of W / Speedbumps / Paint
Ext of CT2 |
47,700 |
|
14 01
|
Aliamanu Elem |
P0303 Install Security Screen |
3,300 |
|
14 02
|
Aliamanu Middle |
Campus Repair Walkways, PH-1 and S-1 Renovate
Interior |
30,600 |
|
14 03
|
Farrington High |
Bldg. A Repaint Exterior & Misc. Concrete
Repairs |
85,000 |
|
14 04
|
Highlands Inter |
Bldg. E Repaint Interior / Bldg. J Replace
Stage Curtain |
17,800 |
|
14 05
|
Kahuku Elementary |
Bldg I - Rpl Carpet - 3 C/Rm |
5,700 |
|
14 06
|
Kalihi Waena Elem |
Resurface Playground Area - 06 Plycrt |
27,000 |
|
14 07
|
Kipapa Elem |
Campus Replace Fence |
10,500 |
|
14 08
|
Lahaina Inter |
Clean A/C Ducts in Music Bldg |
4,500 |
|
14 09
|
Lanai High/Elem |
Refurbish sculpture |
10,000 |
|
14 10
|
Leilehua High |
Replace Walkway from Bldg Q to Bldg O |
17,500 |
|
14 11
|
Maui Waena Elem |
Bldg H (Library) Paint Ext / Bldg L (Locker
Rm) Paint Ext & Int |
42,000 |
|
14 12
|
Mauka Lani Elem |
Rpl Plygrnd Surface |
35,800 |
|
14 13
|
McKinley High |
Bldg. Q - Replace Athletic Lockers Ph 1 & 2
/ Paint Int |
81,700 |
|
14 14
|
Mililani High |
Campus Drainage Improvement |
49,500 |
|
14 15
|
Mililani Waena Elem |
Repaint Interior of Bldg. B |
32,000 |
|
14 16
|
Waiakea High |
Bldg N - Paint Exterior |
50,000 |
|
14 17
|
Waihee Elem |
Restripe Parking Lot |
4,000 |
|
14 18
|
Waimea Middle |
U Repair and Paint Exterior |
50,000 |
|
15 01
|
Ahuimanu El |
C Recarpet Classrooms |
24,000 |
|
15 02
|
Aiea Int |
Resurface Driveway / Replace Walkway & Steps |
36,500 |
|
15 03
|
Aikahi El |
Repaint Cafeteria Int & Ext |
17,500 |
|
15 04
|
Aliamanu El |
Resurface playground |
34,400 |
|
15 05
|
Aliamanu Mid |
Resurface basketball court (Phase I) |
50,000 |
|
15 06
|
Anuenue |
Resurface asphalt / Replace partitions / Clean carpet |
41,200 |
|
15 07
|
Campbell High |
Interior painting of admin. office complex (20+ rooms) |
29,700 |
|
15 08
|
Castle High |
Football field & parking lot drainage improvements |
45,000 |
|
15 09
|
Enchanted Lake El |
Replace Doors - D Bldg. |
5,000 |
|
15 10
|
Hauula El |
Replace Rubbish Bin Storage |
9,700 |
|
15 11
|
Kahuku El |
Replace Carpet in 7 Portables |
27,000 |
|
15 12
|
Kahuku
High & Int |
Replace Flooring |
7,500 |
|
15 13
|
Kailua El |
Library - Repaint Int |
15,000 |
|
15 14
|
Kalaheo High |
Replace Lockers |
12,000 |
|
15 15
|
Kaneohe El |
Repaint Cafeteria Int & Ext |
27,500 |
|
15 16
|
Kapunahala
El (2 ) |
Rpnt Int & Ext of Cafe / Rpl Chlkbds |
30,000 |
|
15 17
|
Kihei El |
Repaint Ext of 5 Buildings & 12 Portables |
66,600 |
|
15 18
|
King Int |
Replace AC Walkway w/ Concrete |
15,000 |
|
15 19
|
King Kam III El |
Extend Cafeteria Counters |
25,000 |
|
15 20
|
Lahainaluna High |
Repair Stairs & Bridge / Repair Leaking Showers |
30,000 |
|
15 21
|
Lanai High & El |
Install Stair Railings |
6,500 |
|
15 22
|
Manana El |
Library Repaint Int / Recarpet / Replace Light Fixtures |
29,500 |
|
15 23
|
Manoa El |
Replace kitchen windows / Reroof & repair
bldg F |
50,000 |
|
15 24
|
Mililani High |
Campus misc. walkway repairs & replacement |
75,000 |
|
15 25
|
Mokapu El |
Recoat & Restripe Plycrt / Replace Bkbrds & Rims |
15,000 |
|
15 26
|
Mountain View El |
Install Covered Walkway |
12,500 |
|
15 27
|
Palisades El |
Repaint interior & recarpet library |
22,300 |
|
15 28
|
Pope El |
Repaint Int of Cafeteria & Admin |
49,000 |
|
15 29
|
Sunset Beach El |
Replace Carpet and Tile in 7 Classrooms / Portables |
23,000 |
|
15 30
|
Waiahole El |
Repair / Replace Backstop |
7,000 |
|
15 31
|
Waikele El |
Repair playground equipment & resurface |
36,400 |
|
15 32
|
Waimanalo El & Int |
Install Partitions |
6,000 |
|
15 33
|
Waimea Middle |
Repaint Interior of Gym |
48,600 |
|
16 01
|
Aikahi El |
Repair Baseball Dugouts |
5,000 |
|
16 02
|
Aliamanu Middle |
Resurface Basketball Court - Phase II |
50,000 |
|
16 03
|
Castle High |
Reconstruct Football Field - Phase I |
50,000 |
|
16 04
|
Farrington High |
Install Irrigation System in Crtyd & Frnt
Lwn |
50,000 |
|
16 05
|
Kaelepulu El (new) |
Install Concrete Ramp & Wlkwy / Railings |
15,000 |
|
16 06
|
Kahaluu El |
Repaint Kitchen & Replace Range Hood |
7,500 |
|
16 07
|
Kahuku
High & Int |
Replace Football Scoreboard |
8,500 |
|
16 08
|
Kailua El |
Library Repl Lights & Install Conc. Wlkwy |
40,000 |
|
16 09
|
Keolu El (new) |
Cafeteria - Install Security Screens |
20,000 |
|
16 10
|
Kihei El |
Repaint Ext. of 3 Buildings & Int of Dining
Rm |
59,400 |
|
16 11
|
Kohala High (new) |
Refinish Gym Floor |
42,000 |
|
16 12
|
Maunawili El (new) |
Playground - Replace Asphalt w/Concrete |
10,000 |
|
16 13
|
Mililani Uka El |
Repaint Ext. of F Bldg / Install Sec. Scrns
G Bldg |
33,200 |
|
16 14
|
Nuuanu El |
Repaint Int and Ext of Covered Gym |
44,800 |
|
17 01
|
Castle High |
Reconstruct Football Field -
Phase II |
50,000 |
|
17 02
|
Kailua High |
Install Security Screens |
6,800 |
|
17 03
|
Kanoelani El |
Repaint Interior of Cafeteria |
10,000 |
|
17 04
|
King Kam III El |
Remove Old Plygrnd & Install
New Plygrnd |
45,000 |
|
17 05
|
Lahainaluna High |
Replace Walkways & Clean A/C
Ducts |
25,000 |
|
17 06
|
Lehua El |
Repaint Int of Cafeteria & Replace
Stage Curtain |
27,500 |
|
17 07
|
Mililani High |
Replace Walkways Between L & M |
50,000 |
|
17 08
|
Nanakuli El |
Install Sprinkler System and
Landscaping |
22,500 |
|
17 09
|
Olomana El |
Renovate Portable Restrooms |
50,000 |
|
17 10
|
Pope El |
Paint Non-Skid Coating on Floors & Stairs |
30,000 |
|
17 11
|
Waiakeawaena El |
Repaint Interior and Exterior
of Cafeteria |
34,000 |
|
18 01
|
Aliamanu El |
Repaint Int Cafeteria / Install Screen Doors |
14,000 |
|
18 02
|
Iao Int |
Install Ground Sign & Security Gate |
31,700 |
|
18 03
|
Kahuku El |
Install Acoustical Tiles in Cafeteria |
9,000 |
|
18 04
|
Kahuku High & Int |
Replace Acoustical Tiles in Cafeteria & Band Room |
24,000 |
|
18 05
|
Kalihi El |
Reconstruct Upper Playcourt |
61,600 |
|
18 06
|
Kanoelani El |
Campus Install Sentricon |
7,500 |
|
18 07
|
King Int |
Repaint Int Gymnasium |
27,500 |
|
18 08
|
Maui Waena Int |
Repaint Ext Shop, Bldg A & Lath Bldg / Rpl Screen |
49,000 |
|
18 09
|
Mililani High |
Replace Handicap Ramp (Design Only) |
16,500 |
|
18 10
|
Momilani El |
Campus Install Sentricon |
3,000 |
|
18 11
|
Pearl City High |
Install Concrete Pad & Planters |
12,700 |
|
19 01
|
Ahuimanu El |
Replace Stage Curtain & Tracks |
4,000 |
|
19 02
|
Aiea High |
Repaint Bleachers / Renovate Circulation Desk |
37,500 |
|
19 03
|
Aikahi El |
Repaint Int of Kitchen |
11,000 |
|
19 04
|
Baldwin High |
Paint Int Locker Rms / Speedbumps / Landscape |
14,700 |
|
19 05
|
Highlands Int |
Replace Light Fixtures / Repaint Locker Room |
16,000 |
|
19 06
|
Iliahi El |
Install Cattle Gate, Speed Bumps, & Wheel Stops |
25,900 |
|
19 07
|
Kahaluu El |
Bldg D Repaint Ext |
13,000 |
|
19 08
|
Kailua El |
Repaint Ext of Pre+ Portable |
4,000 |
|
19 09
|
Kailua High |
Renovate Auto Shop into Counseling Center |
19,500 |
|
19 10
|
Kailua Int |
Repaint Int of Kitchen |
11,500 |
|
19 11
|
Kalani High |
Renovate A.D.'s Office |
2,300 |
|
19 12
|
Kalihi Uka El |
Replace Playground Equip & Surface |
47,500 |
|
19 13
|
Kaneohe El |
Repaint Exterior of A & B Bldgs |
33,000 |
|
19 14
|
Kekaha El |
Remove and Replace Playground Equip & Surface |
47,000 |
|
19 15
|
Keolu El |
Replace Campus Perimeter Fence |
8,500 |
|
19 16
|
King Int |
Resurface Basketball Court / Replace Backboards |
39,000 |
|
19 17
|
King Kam III El |
Replace Playground Equipment |
50,000 |
|
19 18
|
Lahainaluna High |
Replace Concrete Slab |
13,000 |
|
19 19
|
Lahaina Int |
Replace Light Fixtures / Concrete Repairs |
25,500 |
|
19 20
|
Mililani High |
Replace Handicap Ramp |
75,000 |
|
19 21
|
Mililani Waena El |
Install Hdcp Ramp / Replace Teacher Mailboxes |
14,700 |
|
19 22
|
Nanakuli High |
Sprinkler System & Landscaping |
75,000 |
|
19 23
|
Pearl City El |
Replace Stage Curtain & Misc. Campus Sidewalk |
31,500 |
|
19 24
|
Pope El |
Campus Repair Fence |
4,500 |
|
19 25
|
Sunset Beach El |
Install Chain Link Fence & Landscaping |
3,500 |
|
19 26
|
Waiahole El |
Repaint Int of Admin & Library |
15,000 |
|
19 27
|
Waikiki El |
Replace Fence / Doors / Security Screens |
26,000 |
|
19 28
|
Waimanalo El & Int |
Ground Drainage Repairs & Landscaping |
3,000 |
|
19 29
|
Wheeler Mid |
Misc. Concrete Repairs / Railings / Landscaping |
30,000 |
|
20 01
|
Holomua El |
Misc. Repairs to Field and Driveway |
11,800 |
|
20 02
|
Ka'a'awa El |
Install CMU Trash Enclosure |
15,542 |
|
20 03
|
Leilehua High |
Drainage Improve. Gym |
23,500 |
|
20 04
|
Mauka Lani El |
Repaint Exterior of 15 Portables |
17,700 |
|
20 05
|
Wailuku El |
Improve Erosion and Landscaping |
17,647 |
|
21-01
|
Aikahi El |
E Replace Kitchen Lights |
8,900 |
|
21-02
|
Aliamanu El |
K Repaint Interior / Replace Flag Pole |
10,000 |
|
21-03
|
Alvah Scott El |
Replace Playground Equipment |
48,000 |
|
21-04
|
Anuenue |
Library Abate Asbestos Tile / Install Carpet |
64,000 |
|
21-05
|
Ben Parker El |
Recoat and Restripe Playcourt Surface |
13,000 |
|
21-06
|
Iroquois Pt El |
Walkway Repairs / Cafeteria Furniture |
35,000 |
|
21-07
|
Kahuku El |
Replace Playground Equipment |
48,300 |
|
21-08
|
Kailua El |
Kitchen Replace Lights & Repaint Interior |
23,100 |
|
21-09
|
Kailua High |
Misc. Baseball Field & Sprinkler Repairs |
75,000 |
|
21-10
|
Kaimuki High |
Recoat and Restripe Playcourt Surface |
49,400 |
|
21-11
|
Kainalu El |
Resurface Playcourt with Sports Court |
39,200 |
|
21-12
|
Kalani High |
Repaint Interior of Cafeteria |
21,500 |
|
21-13
|
Ke Kula o Ehunuikaimalino |
Install Surfacing for Playground |
40,000 |
|
21-14
|
King Int |
Install Fencing and Railings |
10,000 |
|
21-15
|
King Kaumualii El |
Install Ceiling Fans Various Classrooms |
47,500 |
|
21-16
|
Manoa El |
Improve Ventilation in Various Bldgs |
37,800 |
|
21-17
|
Mililani Mauka El |
Improve Courtyd Drainage / Recoat Plyct |
48,700 |
|
21-18
|
Moanalua High |
Restore Restrooms |
14,800 |
|
21-19
|
Mokulele El |
Replace Planters w/Walkways |
35,000 |
|
21-20
|
Puohala El |
Install Outdoor Benches by Cafeteria |
3,000 |
|
21-21
|
Salt Lake El |
Replace Playground Equip / Install Walkway |
50,000 |
|
21-22
|
Waiahole El |
Extend Retaining Wall |
2,200 |
|
21-23
|
Waianae High |
Repaint Interior of Gymnasium |
19,500 |
|
22-01
|
Ahuimanu El |
Repaint Exterior of Building B |
5,900 |
|
22-02
|
Hanalei El |
Replace Playground Equipment & Surface |
47,800 |
|
22-03
|
Holomua El |
Replace Playground Equipment & Surface |
33,000 |
|
22-04
|
Kahala El |
Replace Playground Equipment & Surface |
48,800 |
|
22-05
|
Kaneohe El |
Install Concrete Walkway |
11,700 |
|
22-06
|
Kipapa El |
Cafeteria Install Security Screens |
22,500 |
|
22-07
|
Lahainaluna High |
Repaint Interior of Girls' Dorm |
48,300 |
|
22-08
|
Leihoku El |
Install Campus Perimeter Fence |
23,500 |
|
22-09
|
Makakilo El |
Install Fence Around Playground |
22,200 |
|
22-10
|
McKinley High |
BB Replace Softball Storage |
37,500 |
|
22-11
|
Mililani High |
Drainage Improvements in Library Area |
32,000 |
|
22-12
|
Mokapu El |
Replace Playground Equipment & Surface |
48,000 |
|
22-13
|
Nahienaena El |
Replace Playground Equipment & Surface |
50,000 |
|
22-14
|
Noelani El |
Install Ceiling Fans in Bldgs. A & B |
50,000 |
|
22-15
|
Wailuku El |
Front Campus Erosion Control |
13,300 |
|
22-16
|
Waimea El |
Cafeteria Install Computer Conduit |
40,400 |
|
23-01
|
Ahuimanu El |
Replace Asphalt Walkway with Concrete |
23,000 |
|
23-02
|
Aiea High |
Library - Replace Windows & Paint Interior |
47,000 |
|
23-03
|
Aiea Int |
Cafeteria Stage - Install Lights & Electrical |
29,800 |
|
23-04
|
Aliamanu Mid |
Convert Shop Into Mtg/Counseling Ctr |
43,900 |
|
23-05
|
Ben Parker El |
Relocate Electrical Transformer |
4,800 |
|
23-06
|
Castle High |
Resurface Football Field -Phase III |
53,000 |
|
23-07
|
De Silva El |
Replace 2 Playgrounds |
50,300 |
|
23-08
|
Haiku El |
Replace Playground |
65,000 |
|
23-09
|
Hauula El |
Replace Chain Link Fence |
19,000 |
|
23-10
|
Hickam El |
Concrete Drainage Improve & Water Line |
29,500 |
|
23-11
|
Holomua El |
D Replace Carpet & Replace Stage Curtain |
30,500 |
|
23-12
|
Honokaa El |
Install Night Lights on Walkways |
17,500 |
|
23-13
|
Kaahumanu El |
Replace Sprinkler System and Landscape |
18,500 |
|
23-14
|
Kahuku High & Int |
Improve Ventilation in Cafeteria |
40,500 |
|
23-15
|
Kailua Int |
Replace Tile in Bandroom & Replace Fence |
49,400 |
|
23-16
|
Kainalu El |
Repaint Interior of Kitchen |
15,900 |
|
23-17
|
Kamaile El |
Replace Stage Curtain & Replace Carpet |
22,100 |
|
23-18
|
Kauai High |
Misc. Improvements to Athletic Field |
25,000 |
|
23-19
|
Kaunakakai El |
Admin Install Security Screens |
25,900 |
|
23-20
|
Kilohana El |
Install Security Screens & A Paint Exterior |
60,000 |
|
23-21
|
Kohala El |
Install Covered Walkway - Phase I Design |
20,000 |
|
23-22
|
Konawaena High |
Replace Light Fixtures in Library |
33,400 |
|
23-23
|
Lahainaluna High |
Repaint Exterior of Girls' Dorm |
36,400 |
|
23-24
|
Manoa El |
Improve Ventilation in 22 Classrooms |
38,800 |
|
23-25
|
Maunaloa El |
Install Security Screens & Paint Kitchen Int |
22,500 |
|
23-26
|
Mililani High |
Replace Cafeteria Wall Partition |
48,900 |
|
23-27
|
Moanalua High |
Install SMART LAB Partitions |
37,500 |
|
23-28
|
Molokai High |
Install Security Screens & Replace Lights |
55,200 |
|
23-29
|
Molokai Middle |
Install Security Screens on U Bldg |
6,500 |
|
23-30
|
Mountain View El |
Resurface Covered Play Court |
7,900 |
|
23-31
|
Niu Valley Mid |
Stage - Replace Curtain & Refinish Floor |
15,900 |
|
23-32
|
Paauilo El & Int |
Remove Norfolk Pine Trees |
23,300 |
|
23-33
|
Pope El |
Repair and Install Concrete Walkways |
35,000 |
|
23-34
|
Stevenson Mid |
Restoration of Greenhouse |
15,400 |
|
23-35
|
Waiahole El |
Enclose Conference Room |
4,900 |
|
23-36
|
Waianae El |
Replace Playground & Resurface Playcourt |
117,800 |
|
23-37
|
Waianae High |
Refinish Gym Floor & Move Partition |
49,500 |
|
23-38
|
Waianae Int |
Install Security Screens on 5 Portables |
14,500 |
|
23-39
|
Waikele El |
Replace Carpet in 2 Bldgs (8 Classrms each) |
32,300 |
|
24-01
|
Aina Haina El |
Replace Playground Equip / Refinish Stage |
14,000 |
|
24-02
|
Anuenue |
Misc. Improvements for Portable |
74,200 |
|
24-03
|
Baldwin High |
Replace Carpet / Repaint Parking Lot |
9,300 |
|
24-04
|
Farrington High |
Misc. Repairs to Auditorium |
50,000 |
|
24-05
|
Hale Kula El |
Replace Carpet in Transition Center |
5,000 |
|
24-06
|
Iao Int |
Erosion Control / Install Security Screens |
37,100 |
|
24-07
|
Kaaawa El |
Replace Playground Surfacing |
31,300 |
|
24-08
|
Kalanianaole El |
Repaint Exterior of D Bldg |
43,000 |
|
24-09
|
Kaleiopuu El |
Replace Stage Curtains / Repaint Parking Lot |
20,100 |
|
24-10
|
Kaumana El |
Replace Playground |
71,800 |
|
24-11
|
Keonepoko El |
Replace Playground |
58,600 |
|
24-12
|
Kilohana El |
Electrical Improvements / Install Security Screens |
15,900 |
|
24-13
|
Lahaina Int |
Replace Student Lockers |
9,800 |
|
24-14
|
Leilehua High |
Install Emergency Lights / S Repair Entry Roof |
19,300 |
|
24-15
|
Maili El |
Install Drinking Fountains / Ext Paint 7 Portables |
75,000 |
|
24-16
|
Makaha El |
Replace Plygrnd Equip / Repair Drinking Fountains |
43,400 |
|
24-17
|
Maunaloa El |
Repaint Exterior of Teacher Cottages |
24,500 |
|
24-18
|
Mililani Uka El |
Replace Floor Tile in Library |
13,700 |
|
24-19
|
Molokai High |
Install Security Screens |
52,600 |
|
24-20
|
Nanakuli El |
Install Sprinkler System & Tables |
15,000 |
|
24-21
|
Puohala El |
Replace Playground Eqiup & Surface |
48,200 |
|
24-22
|
Waiahole El |
Resurface Playcourt / Retop Playground Surface |
36,900 |
|
24-23
|
Waimalu El |
Student Drop Off Safety Improvements |
50,000 |
|
24-24
|
Wailuku El |
Campus Repaint Railings |
16,000 |
|
24-25
|
Webling El |
Demolish Wall / Relocate Switches & Wiring |
4,600 |
|
24-26
|
Mililani Ike El |
Paint 13 Portables |
51,200 |
|
25-01
|
Aliamanu El |
Replace Playground |
50,000 |
|
25-02
|
Ben Parker El |
Replace 2 Playground Surfaces |
45,000 |
|
25-03
|
Enchanted Lake El |
Drainage Improvements Behind K Bldg |
10,000 |
|
25-04
|
Farrington High |
Renovate Restrooms in Auditorium |
40,000 |
|
25-05
|
Hickam El |
Install Walkway/Bikeway |
21,000 |
|
25-06
|
Kailua High |
Replace Baseball Bleachers & Walkway |
49,000 |
|
25-07
|
Kaneohe El |
Install Concrete Slabs and Benches |
15,300 |
|
25-08
|
Keolu El |
Replace Playground |
49,900 |
|
25-09
|
Maunawili El |
Install Windbreaker & Replace School Sign |
30,000 |
|
25-10
|
Salt Lake El |
Replace Playground |
47,400 |
|
25-11
|
Waihee El |
Install Partition & Window for Kiln Room |
5,400 |
|
26-01
|
Alvah Scott El |
Replace Playground Equipment |
40,200 |
|
26-02
|
Honokaa El/Int |
ADA Walkway |
11,800 |
|
26-03
|
Dole Middle |
Repaint Entire Campus |
90,000 |
|
27-01
|
Baldwin High |
Replace Boys' Lockers |
45,900 |
|
27-02
|
Iao Int |
Replace Fence and Repave Asphalt Lot |
25,400 |
|
27-03
|
Kalaheo El |
Rpl. Stage Curtains / Repaint Int. Cafeteria |
44,600 |
|
27-04
|
Lahainaluna High |
Rpl. Concrete / Rebuild Marine Ed. Bldg. |
28,500 |
|
27-05
|
Pearl City El |
Replace Playground |
50,000 |
|
27-06
|
Waihee El |
Install Security Screens in 4 Buildings |
22,400 |
|
27-07
|
Waikiki El |
Replace Concrete Walkway |
20,000 |
|
27-08
|
Roosevelt High |
Repaint Bleachers |
50,000 |
|
28-01
|
Hana High & El |
Renovate Lath House |
75,000 |
|
28-02
|
Kaaawa El |
Recoat Playcourt / Replace B-Ball Backbds |
27,500 |
|
28-03
|
Kaimuki High |
Refinish & Repaint Gym Floor |
29,300 |
|
28-04
|
Kalanianaole El & Int |
Refurbish 58 Cafeteria Tables |
22,700 |
|
28-05
|
Manoa El |
Replace 2 Playgrounds |
50,000 |
|
28-06
|
Radford High |
Resurface Plycrt / Add Padding & Lights |
50,200 |
|
28-07
|
Waiahole El |
Extend Sidewalk - Bldg G |
5,600 |
|
28-08
|
Waianae El |
Install Cattle Gate / Landscaping |
7,500 |
|
28-09
|
Waipahu El |
Restripe Parking Lot / Repaint Railings |
6,500 |
|
29-01
|
DeSilva El |
Install Ceiling Fans in Bldgs B, D & G |
14,100 |
|
29-02
|
Eleele El |
Replace Playground |
36,400 |
|
29-03
|
Honokaa High & Int |
Install ADA Ramp & Chain Link Fence |
17,100 |
|
29-04
|
Kaunakakai El |
Install Security Scrn / Renovate Kiln Rm |
31,500 |
|
29-05
|
Kilohana El |
Repl Sink / Paint Ext Port / Install Ceil. Fans |
22,700 |
|
29-06
|
King Int |
Install Retaining Wall & Landscaping |
37,500 |
|
29-07
|
Kohala El |
Install Covered Walkway |
50,000 |
|
29-08
|
Maunaloa El |
Campus Replace Chain Link Fence |
23,800 |
|
29-09
|
Maunawili El |
Replace Playground |
50,000 |
|
29-10
|
Molokai High |
Replace Kitchen Lights / Replace Walkway |
19,300 |
|
29-11
|
Molokai Mid |
Install Partition & Secure Storage |
18,400 |
|
29-12
|
Nuuanu El |
Recoat Playcourt & Replace Doors |
21,000 |
|
29-13
|
Pope El |
Repair & Replace Various Sidewalks |
28,000 |
|
29-14
|
Waihee El |
Install Fence & Gate |
4,200 |
|
29-15
|
Wailuku El |
Install Security Screens |
12,500 |
|
29-16
|
Waimanalo El & Int |
Install Partition & Replace School Sign |
37,000 |
|
29-17
|
Kapolei Middle |
Repaint Exterior of Various Buildings |
50,000 |
|
29-18
|
Radford High |
Repaint Exterior of Various Buildings |
90,000 |
|
30-01
|
Ben Parker El |
Replace Playground |
34,100 |
|
30-02
|
Kaunakakai Elem |
Install Ceiling Fans in Bldg A & P-2064 |
17,200 |
|
30-03
|
Kilohana Elem |
Bldg H Replace Gutters & Downspouts |
17,500 |
|
30-04
|
Kualapuu El PCS |
Rpl Stage Curt/Install Wlkwy/Rpr Elec Boxes |
35,600 |
|
30-05
|
Leihoku Elem |
Campus Install 128 Ceiling Fans |
55,000 |
|
30-06
|
Maili Elem |
Replace Playground Surfacing |
30,000 |
|
30-07
|
Maunaloa El |
Bldg A Repair and Repaint Walkway |
17,800 |
|
30-08
|
Maunawili Elem |
Rpnt Int Café/Rpl Ceil Fans, Gutters, Gates |
37,500 |
|
30-09
|
Molokai High |
Rpl Light Fixtures/Install Sinks & Waterlines |
10,000 |
|
30-10
|
Mt. View |
Replace Playground & Walkway |
55,900 |
|
30-11
|
Pauoa Elem |
Install Sprinkler System & Landscaping |
36,300 |
|
30-12
|
Pope Elem |
Replace Playground |
50,000 |
|
30-13
|
Puohala Elem |
Replace Playground Surfacing |
26,300 |
|
30-14
|
Waimanalo El/Int |
Replace Basketball Backboards |
19,000 |
|
31-01
|
Aliamanu El |
Replace Cabinets, Countertops, Mailboxes |
14,500 |
|
31-02
|
Hale Kula El |
Install Partitions in Classroom & 6 Portables |
15,000 |
|
31-03
|
Hauula El |
Replace 1 Playground & 1 Playground Equip |
57,600 |
|
31-04
|
Helemano El |
Replace Playground |
50,000 |
|
31-05
|
Hickam El |
Replace Preschool Playground |
50,000 |
|
31-06
|
Kainalu El |
Install Stage Lites/Replace Plygrnd Surface |
37,900 |
|
31-07
|
Kapolei El |
Repairs to PCNC Room |
5,000 |
|
31-08
|
Leilehua High |
Gym Drainage Improvements |
32,500 |
|
31-09
|
Makakilo El |
Demo Wall & Install Walkwy for Health Rm |
4,000 |
|
31-10
|
Moanalua El |
Recoat Playcourt/Replace Backbds/Parking Restripe |
39,600 |
|
31-11
|
Moanalua High |
Concrete Pad, Benches & Wlkwy/Parking Restripe |
24,000 |
|
31-12
|
Mokapu El |
Replace Playground |
49,700 |
|
31-13
|
Nimitz El |
Replace Playground Surface |
21,400 |
|
31-14
|
Pearl Harbor El |
Replace Playground |
50,000 |
|
31-15
|
Pearl Harbor Kai El |
Replace Playground (Phase I)/Parking Restripe |
50,000 |
|
31-16
|
Red Hill El |
Replace 2 Playground Surfaces |
34,400 |
|
31-17
|
Waiahole El |
Replace Fitness Playground |
26,100 |
|
31-18
|
Webling El |
Replace 1 Playground & 1 Playground Surface |
49,500 |
|
32-01
|
Keonepoko El * |
Repaint Int of Portables (Lead Paint) |
16,590 |
|
32-02
|
Aikahi El |
Add Safety Loose Fill Surfacing to Plygrnd |
50,000 |
|
32-03
|
Helemano El |
Install ADA Accessible Concrete Ramp |
28,000 |
|
32-04
|
Kaunakakai El |
Replace Wheelchair Lift in Cafeteria |
30,200 |
|
32-05
|
Kipapa El |
Drainage Improve/Parking Lot Restripe |
31,000 |
|
32-06
|
Maunaloa El |
Repaint Ext of Administration Bldg. |
10,800 |
|
32-07
|
Mililani High |
Design and Build Student Dining Pavilion |
25,000 |
|
32-08
|
Mililani Mauka El |
Replace Stage Curtains/Build Shoe Racks |
9,700 |
|
32-09
|
Moanalua High |
Restripe Parking Lot |
3,000 |
|
32-10
|
Molokai Mid |
Resurface Gym Floor/Replace Jalousies |
77,300 |
|
32-11
|
Pauoa El |
Replace School Marquee Sign |
23,300 |
|
32-12
|
Pearl Harbor Kai El |
Replace Playground - Phase II |
49,000 |
|
32-13
|
Solomon El |
Recoat Playcourt/Restripe Parking Lot |
31,000 |
|
32-14
|
Waimalu El |
Parking Safety and Security Improvements |
40,400 |
|
32-15
|
Nanakuli Hi/Int |
Install Sprinkler System & Landscaping |
59,000 |
|
32-16
|
Maili Elem |
Replace Existing Chainlink Fence |
29,500 |
|
32-17
|
Makaha El |
D, Recarpet 6 classrooms |
24,000 |
|
32-18
|
Waianae El |
Install Security Screens, Bldg B, C, D |
79,000 |
|
33-01
|
Anuenue |
Replace 2 Playgrounds / Restripe Parking |
67,700 |
|
33-02
|
Hana High & El |
Repair & Replace Lanai Deck, Rail, & Ramps |
47,500 |
|
33-03
|
Hauula El |
Replace Carpet & Repaint Library |
46,900 |
|
33-04
|
Hilo Union El |
Replace Playground |
50,000 |
|
33-05
|
Kahuku El |
Replace Cafeteria Ceiling Fans |
19,900 |
|
33-06
|
Kaumana El |
Replace Playground Surface |
37,600 |
|
33-07
|
Kaunakakai El |
Replace & Expand Playground Surface |
29,000 |
|
33-08
|
Keaukaha El |
Replace Playground |
50,000 |
|
33-09
|
Maunaloa El |
Replace Playground |
49,200 |
|
33-10
|
Pearl Harbor El |
Replace Fencing |
26,500 |
|
33-11
|
Pope El |
Recoat Playcourt & Replace Backboards |
45,800 |
|
33-12
|
Waiahole El |
Extend Wall & Fence |
9,900 |
|
33-13
|
Waimea High |
Replace Bleachers, Sidewalk, & Lights |
40,500 |
|
|
|
|
|
|
TOTAL |
$13,989,581
|
|