Summary
of Hawaii 3R's Projects
|
H3R's Proj. #
|
School Name |
General Description of Main Project Areas |
H3R's Grant Award
|
1 |
01 01
|
Wahiawa Middle |
Interior painting of Buildings A, D, F, G, H |
$14,000 |
2 |
01 02
|
Kapunahala Elementary |
Restoration of electrical system |
$25,000 |
3 |
01 03
|
Baldwin High |
Interior painting and electrical outlet installation in several
portables |
$23,500 |
4 |
01 04
|
Roosevelt High |
Repair Physical Education Locker Rooms/Facility |
$25,000 |
5 |
01 05
|
Waianae Intermediate |
Exterior painting of Buildings A, F |
$25,000 |
6 |
02 01
|
Kalihi-Waena Elementary |
Exterior painting of Buildings C, D |
$25,000 |
7 |
02 02
|
Kauai High |
Exterior painting of Building Z |
$2,900 |
8 |
02 03
|
King Kaumuali'i Elementary |
Exterior painting of 4 portables |
$4,800 |
9 |
02 04
|
Lahainaluna High |
Handrail installation on Buildings J, I; upgrade football
field lights |
$25,000 |
10 |
02 05
|
Moanalua Middle |
Exterior painting of Building I (Cafeteria) |
$15,000 |
11 |
02 06
|
Nanakuli Elementary |
Exterior painting |
$24,000 |
12 |
02 07
|
Waimalu Elementary |
Exterior painting of Building E, minor concrete repairs |
$25,000 |
13 |
02 08
|
Wilson Elementary |
Re-carpet Building E (Library) |
$11,000 |
14 |
03 02
|
Kailua Intermediate |
Exterior painting of Cafeteria |
$21,500 |
15 |
03 04
|
Kapunahala Elementary |
Interior painting of Building A, B; drainage improvements;
replace dining room lights, walkway lights |
$51,000 |
16 |
03 05
|
Kaunakakai Elementary |
Install security screens on Building C |
$25,000 |
17 |
03 06
|
King Kamehameha III Elementary |
Exterior painting of Portables 14, 17; roof painting of Buildings
A, D; carpeting Building E, Portables 11, 16 |
$29,350 |
18 |
03 07
|
Kipapa Elementary |
Exterior painting of Buildings A, J, L |
$45,200 |
19 |
03 08
|
Moanalua Middle |
Interior painting of Building F, K |
$25,300 |
20 |
03 09
|
Puuhale Elementary |
Exterior painting of Building A; encapsulate transite panels |
$28,100 |
21 |
03 10
|
Shafter Elementary |
Interior painting of Buildings A, B, C, E |
$46,700 |
22 |
03 12
|
Waiakea Elementary |
Exterior painting of Portables 14, 17; roof painting of Buildings
A, D; carpeting Building E, Portables 11, 16 |
$18,000 |
23 |
03 13
|
Waiakea Waena Elementary |
Exterior painting of Building I (Cafeteria) |
$21,000 |
24 |
03 14
|
Waimalu Elementary |
Exterior painting of Building E; structural repairs |
$50,000 |
25 |
03 15
|
Wheeler Elementary |
Interior painting of 2 classrooms |
$20,000 |
26 |
03 16
|
Wheeler Middle |
Exterior painting of Building E |
$42,000 |
27 |
04 01
|
Pearl Harbor Kai Elementary |
Exterior painting of Buildings A, B, C, D, E, H, I, covered
walkways |
$70,000 |
28 |
04 02
|
Mililani Uka Elementary |
Exterior painting of three portables |
$5,850 |
29 |
04 03
|
Kipapa Elementary |
Exterior painting of Buildings C, D |
$51,816 |
30 |
04 04
|
Aliamanu Elementary |
Bathroom renovation |
$60,000 |
31 |
04 06
|
Kaimuki High |
Interior and exterior painting of Building N |
$19,100 |
32 |
04 07
|
Leilehua High |
Interior painting of 5 portables; replace walkway |
$30,000 |
33 |
05 01
|
Eleele Elementary |
Interior painting of Library, Library Workroom and Library
Office |
$4,043 |
34 |
05 02
|
Puuhale Elementary |
Exterior painting of Building D |
$15,100 |
35 |
05 03
|
Waiahole Elementary |
Exterior painting of Buildings D, F, G, Portables 1, 2 |
$27,000 |
36 |
05 04
|
Hickam Elementary |
Transforming Quonset Hut into Multi-Purpose Facility |
$50,000 |
37 |
05 05
|
Mililani Waena Elementary |
Interior painting of Building D |
$26,000 |
38 |
05 06
|
King Kamehameha III Elem. |
Interior painting of Buildings C, E bathrroms, metal roof
repainting of Building B, C, E |
$11,500 |
39 |
06 01
|
Aliiolani Elementary |
Resurfacing Two Parking Lots |
$50,000 |
40 |
06 02
|
Kaimuki High |
Exterior painting of Cafeteria, Swimming Pool Building, Music
Building; Replace Windows/Security Screens on Building M |
$60,000 |
41 |
06 03
|
Kaiser High |
Exterior/interior painting of Cafeteria, exterior painting
of Locker Rooms |
$50,000 |
42 |
06 04
|
Blanche Pope Elementary |
Exterior painting of Buildings A, B |
$60,000 |
43 |
07 01
|
Aliamanu Middle |
Repaint interior/replace flooring of Library |
$19,300 |
44 |
07 02
|
Farrington High |
Resurface football field, install sprinkler system |
$50,000 |
45 |
07 03
|
Jefferson Elementary |
Resurface playcourt |
$9,300 |
46 |
07 04
|
Kaahumanu Elementary |
Recarpet 12 Classrooms |
$41,500 |
47 |
07 05
|
Mililani Uka Elementary |
Repaint 3 portables; recarpet Portables P-3, P-4, P-5, P-6,
P-7, D-4 |
$21,050 |
48 |
07 06
|
Mililani Waena Elementary |
Exterior painting of Portables P1, P2, P3, P4, P5, P6, P7,
P8, P9, P10, P11, P12 |
$29,200 |
49 |
07 07
|
Nanakuli Elementary |
Exterior painting of Cafeteria, replace stage curtains |
$20,300 |
50 |
07 08
|
Nanakuli High |
Replace Greenhouse |
$37,450 |
51 |
07 09
|
Nuuanu Elementary |
Replace Light fixtures in Buildings D, E, F, G, H, I, L,
M, N; Replace Lamps |
$51,114 |
52 |
07 10
|
Blanche Pope Elementary |
Exterior painting of Buildings C, D |
$47,650 |
53 |
07 11
|
Red Hill Elementary |
Install Electrical Outlets in Buildings B, C, D |
$50,000 |
54 |
07 12
|
Salt Lake Elementary |
Exterior painting of Cafeteria, Library, Teacher's Workroom,
Buildings C, D, Portables P1, P2, P3, P4 |
$57,200 |
55 |
07 13
|
Waipahu Intermediate |
Interior painting of Buildings C, M; exterior painting of
Building S |
$49,709 |
56 |
07 14
|
Maui Waena Intermediate |
Interior/exterior painting of Buildings 2184, 2185, 2186,
2187, 2221, 2222; Repaint fence |
$50,000 |
57 |
07 15
|
Kahakai Elementary |
Exterior painting of Building D, Exterior/Interior painting
of Cafeteria |
$57,000 |
58 |
07 16
|
Waiakea High |
Exterior painting of Buildings B, C, D, E, F, H, I, J, K,
L, M, Q, R, U |
$50,000 |
59 |
07 17
|
Kaunakakai Elementary |
Install security screens on Buildings A, F; Exterior painting
of Building I |
$53,000 |
60 |
08 01
|
Kalanianaole Elementary |
Repaint interior of Cafeteria and Building J |
$35,000 |
61 |
08 02
|
McKinley High |
Repaint exterior of Cafeteria |
$17,500 |
62 |
08 03
|
Mililani Middle |
Install gate/walkway, modify drainage, re-grade area, replace
door stops |
$7,250 |
63 |
08 04
|
Waihee Elementary |
Replace light fixtures in Building A, paint bus waiting area |
$12,500 |
64 |
09 01
|
Holomua Elementary |
Bldg D - Repaint Interior Hallways & Recarpet
Classrms |
$24,300 |
65 |
09 02
|
Kailua Intermediate |
Renovate Music Room |
$36,200 |
66 |
09 03
|
Kaimiloa Elementary |
Repaint Exterior of 15 Portables |
$36,000 |
67 |
09 04
|
Kekaha Elementary |
Install Irrigation System and Tree Trimming |
$49,700 |
68 |
09 05
|
Kihei Elementary |
Replace Irrigation Pump |
$5,800 |
69 |
09 06
|
Lokelani Intermediate |
Replace Irrigation Pump |
$5,800 |
70 |
09 07
|
Makakilo Elementary |
Repaint Exterior of 4 Large Classroom Buildings |
$53,900 |
71 |
09 08
|
Mililani High |
Demolition of A/C & Duct System, & Ceiling
Repair |
$6,000 |
72 |
09 09
|
Waiakeawaena Elementary |
Repaint Exterior of 2 Large Classroom Buildings |
$50,000 |
73 |
10 01
|
Aliamanu Middle |
Music & Band rooms - Replace tile & carpet,
repaint interior |
$22,000 |
74 |
10 02
|
Baldwin High |
Library - Paint interior |
$14,000 |
75 |
10 03
|
Holumua Elementary |
E Bldg. - Replace classroom carets, pain
interior hallways |
$27,600 |
76 |
10 04
|
Kahuku High |
Gym - Replace tile in foyer & office, paint
interior |
$20,000 |
77 |
10 05
|
Kea'au Middle |
Renovate Locker room |
$34,300 |
78 |
10 06
|
Mililani Middle |
Tint all windows campus-wide |
$25,000 |
79 |
10 07
|
Radford High |
Install retaining wall on football field |
$11,000 |
80 |
10 08
|
Gus Webling Elementary |
Install ADA walkway to playground equpment
and concrete pad |
$24,850 |
81 |
10 09
|
Wilson Elementary |
Bldg. C, D & F - Install security screens |
$35,000 |
82
|
11 01
|
Aiea El |
Install Sprinkler System |
8,300 |
83 |
11 02
|
Farrington High |
Repair Showers & Locker Rooms |
50,000 |
84 |
11 03
|
Kahuku
High & Int |
Replace Tile in Music Room, Foyer, Office |
11,200 |
85 |
11 04
|
Kaimuki High |
Expand Snack Shop Window & Repair Termite
Damage |
3,000 |
86 |
11 05
|
Keaau Middle |
Termite Treatment of Gym & Repair Termite
Damage |
18,000 |
87 |
11 06
|
Kipapa El |
Recarpet Library |
16,550 |
88 |
11 07
|
Lahainaluna High |
Retile Dormitory |
28,000 |
89 |
11 08
|
Lehua El |
Install Sprinkler System |
17,800 |
90 |
11 09
|
Leilehua High |
Repaint Interior of Gym & Related Rooms |
48,000 |
91 |
11 10
|
Makakilo El |
Repaint Exterior of 3 Buildings |
24,500 |
92 |
11 11
|
Manoa El |
Replace Window Hardware & Screens of Cafeteria |
58,000 |
93 |
11 12
|
Maui Waena El |
Repaint Interior & Exterior of Cafeteria, & Recarpet
Stage |
35,900 |
94 |
11 13
|
Mililani Uka |
Repaint Exterior of 2 Buildings |
31,000 |
95 |
11 14
|
Mililani Waena |
Repaint Int. of 12 Port., Retile Dining Rm, & Replace
Office Counters |
51,700 |
96 |
11 15
|
Solomon El |
Install Emergency Exit Doors & Landings for
2 Portables |
15,000 |
97 |
11 16
|
Waiakea High |
Repaint Exterior of 7 Portables |
20,500 |
98 |
11 17
|
Waialua El |
Replace Walkway & Install Concrete Slab |
16,000 |
99 |
11 18
|
Waimea El |
Repaint Exterior of 2 Buildings |
50,000 |
100 |
11 C1
|
Kainalu El |
Resurface & Restripe Playcourt, Replace Backboards,
Repair Fence |
27,000 |
101 |
11 C2
|
Lanikai El |
Replace Chain Link Fence |
6,500 |
102 |
11 C3
|
Pope El |
Recarpet and Retile |
21,000 |
103 |
11 C4
|
Waimanalo El |
Security fences and Gates |
670 |
104 |
12 01
|
Lahaina Int |
Install Sidewalk & Drainage Improvements |
17,300 |
105 |
12 02
|
Lahainaluna High |
Interior and Exterior Painting |
50,000 |
106 |
12 03
|
Maui High |
Interior and Exterior Painting |
37,000 |
107 |
12 04
|
Mauka Lani El |
Install ADA Sidewalk Curb Ramp |
1,500 |
108 |
12 05
|
Pearl City Highlands El |
Install Sprinkler System |
25,500 |
109
|
13 01
|
Aikahi El |
Portable 1 - Replace stairs & ramp |
3,250
|
110
|
13 02
|
Aliamanu El |
Install Security Screens on 3 Bldgs |
6,000
|
111
|
13 03
|
Aliamanu Middle |
Resurface floor w/Epoxy coating / Repaint interior |
16,300
|
112
|
13 04
|
Heeia El |
Recoat non-skid coating on 6 stairwells / restripe |
7,000
|
113
|
13 05
|
Jarrett Middle |
Recarpet & repaint Library / Repaint & repair
Music Rm |
46,500
|
114
|
13 06
|
Kalaheo High |
Demo CMU walls & footings / build CMU wall
/ Replace doors |
8,100
|
115
|
13 07
|
Kapunahala El |
Repaint library |
3,400
|
116
|
13 08
|
Kaunakakai El |
Bldgs A & F Repaint Int / Refinish Stage /
Recarpet |
33,500
|
117
|
13 09
|
Lihikai El |
Paint interior kitchen |
7,500
|
118
|
13 10
|
Mililani Mauka El |
Install Railings along walkway |
6,000
|
119
|
13 11
|
Waimanalo
El & Int |
Replace AC walkway w/concrete / Repair & Widen
Walkways |
16,000
|
120
|
13 12
|
Waimea Middle |
Paint Int & Ext of W / Speedbumps / Paint
Ext of CT2 |
47,700
|
| 121 |
14 01
|
Aliamanu Elem |
P0303 Install Security Screen |
3,300
|
| 122 |
14 02
|
Aliamanu Middle |
Campus Repair Walkways, PH-1 and S-1 Renovate
Interior |
30,600
|
| 123 |
14 03
|
Farrington High |
Bldg. A Repaint Exterior & Misc. Concrete
Repairs |
85,000
|
| 124 |
14 04
|
Highlands Inter |
Bldg. E Repaint Interior / Bldg. J Replace
Stage Curtain |
17,800
|
| 125 |
14 05
|
Kahuku Elementary |
Bldg I - Rpl Carpet - 3 C/Rm |
5,700
|
| 126 |
14 06
|
Kalihi Waena Elem |
Resurface Playground Area - 06 Plycrt |
27,000
|
| 127 |
14 07
|
Kipapa Elem |
Campus Replace Fence |
10,500
|
| 128 |
14 08
|
Lahaina Inter |
Clean A/C Ducts in Music Bldg |
4,500
|
| 129 |
14 09
|
Lanai High/Elem |
Refurbish sculpture |
10,000
|
| 130 |
14 10
|
Leilehua High |
Replace Walkway from Bldg Q to Bldg O |
17,500
|
| 131 |
14 11
|
Maui Waena Elem |
Bldg H (Library) Paint Ext / Bldg L (Locker
Rm) Paint Ext & Int |
42,000
|
| 132 |
14 12
|
Mauka Lani Elem |
Rpl Plygrnd Surface |
35,800
|
| 133 |
14 13
|
McKinley High |
Bldg. Q - Replace Athletic Lockers Ph 1 & 2
/ Paint Int |
81,700
|
| 134 |
14 14
|
Mililani High |
Campus Drainage Improvement |
49,500
|
| 135 |
14 15
|
Mililani Waena Elem |
Repaint Interior of Bldg. B |
32,000
|
| 136 |
14 16
|
Waiakea High |
Bldg N - Paint Exterior |
50,000
|
| 137 |
14 17
|
Waihee Elem |
Restripe Parking Lot |
4,000
|
| 138 |
14 18
|
Waimea Middle |
U Repair and Paint Exterior |
50,000
|
| 139 |
15 01
|
Ahuimanu El |
C Recarpet Classrooms |
24,000 |
| 140 |
15 02
|
Aiea Int |
Resurface Driveway / Replace Walkway & Steps |
36,500 |
| 141 |
15 03
|
Aikahi El |
Repaint Cafeteria Int & Ext |
17,500 |
| 142 |
15 04
|
Aliamanu El |
Resurface playground |
34,400 |
| 143 |
15 05
|
Aliamanu Mid |
Resurface basketball court (Phase I) |
50,000 |
| 144 |
15 06
|
Anuenue |
Resurface asphalt / Replace partitions / Clean carpet |
41,200 |
| 145 |
15 07
|
Campbell High |
Interior painting of admin. office complex (20+ rooms) |
29,700 |
| 146 |
15 08
|
Castle High |
Football field & parking lot drainage improvements |
45,000 |
| 147 |
15 09
|
Enchanted Lake El |
Replace Doors - D Bldg. |
5,000 |
| 148 |
15 10
|
Hauula El |
Replace Rubbish Bin Storage |
9,700 |
| 149 |
15 11
|
Kahuku El |
Replace Carpet in 7 Portables |
27,000 |
| 150 |
15 12
|
Kahuku
High & Int |
Replace Flooring |
7,500 |
| 151 |
15 13
|
Kailua El |
Library - Repaint Int |
15,000 |
| 152 |
15 14
|
Kalaheo High |
Replace Lockers |
12,000 |
| 153 |
15 15
|
Kaneohe El |
Repaint Cafeteria Int & Ext |
27,500 |
| 154 |
15 16
|
Kapunahala
El (2 ) |
Rpnt Int & Ext of Cafe / Rpl Chlkbds |
30,000 |
| 155 |
15 17
|
Kihei El |
Repaint Ext of 5 Buildings & 12 Portables |
66,600 |
| 156 |
15 18
|
King Int |
Replace AC Walkway w/ Concrete |
15,000 |
| 157 |
15 19
|
King Kam III El |
Extend Cafeteria Counters |
25,000 |
| 158 |
15 20
|
Lahainaluna High |
Repair Stairs & Bridge / Repair Leaking Showers |
30,000 |
| 159 |
15 21
|
Lanai High & El |
Install Stair Railings |
6,500 |
| 160 |
15 22
|
Manana El |
Library Repaint Int / Recarpet / Replace Light Fixtures |
29,500 |
| 161 |
15 23
|
Manoa El |
Replace kitchen windows / Reroof & repair
bldg F |
50,000 |
| 162 |
15 24
|
Mililani High |
Campus misc. walkway repairs & replacement |
75,000 |
| 163 |
15 25
|
Mokapu El |
Recoat & Restripe Plycrt / Replace Bkbrds & Rims |
15,000 |
| 164 |
15 26
|
Mountain View El |
Install Covered Walkway |
12,500 |
| 165 |
15 27
|
Palisades El |
Repaint interior & recarpet library |
22,300 |
| 166 |
15 28
|
Pope El |
Repaint Int of Cafeteria & Admin |
49,000 |
| 167 |
15 29
|
Sunset Beach El |
Replace Carpet and Tile in 7 Classrooms / Portables |
23,000 |
| 168 |
15 30
|
Waiahole El |
Repair / Replace Backstop |
7,000 |
| 169 |
15 31
|
Waikele El |
Repair playground equipment & resurface |
36,400 |
| 170 |
15 32
|
Waimanalo El & Int |
Install Partitions |
6,000 |
| 171 |
15 33
|
Waimea Middle |
Repaint Interior of Gym |
48,600 |
| 172 |
16 01
|
Aikahi El |
Repair Baseball Dugouts |
5,000 |
| 173 |
16 02
|
Aliamanu Middle |
Resurface Basketball Court - Phase II |
50,000 |
| 174 |
16 03
|
Castle High |
Reconstruct Football Field - Phase I |
50,000 |
| 175 |
16 04
|
Farrington High |
Install Irrigation System in Crtyd & Frnt
Lwn |
50,000 |
| 172 |
16 05
|
Kaelepulu El (new) |
Install Concrete Ramp & Wlkwy / Railings |
15,000 |
| 177 |
16 06
|
Kahaluu El |
Repaint Kitchen & Replace Range Hood |
7,500 |
| 178 |
16 07
|
Kahuku
High & Int |
Replace Football Scoreboard |
8,500 |
| 179 |
16 08
|
Kailua El |
Library Repl Lights & Install Conc. Wlkwy |
40,000 |
| 180 |
16 09
|
Keolu El (new) |
Cafeteria - Install Security Screens |
20,000 |
| 181 |
16 10
|
Kihei El |
Repaint Ext. of 3 Buildings & Int of Dining
Rm |
59,400 |
| 182 |
16 11
|
Kohala High (new) |
Refinish Gym Floor |
42,000 |
| 183 |
16 12
|
Maunawili El (new) |
Playground - Replace Asphalt w/Concrete |
10,000 |
| 184 |
16 13
|
Mililani Uka El |
Repaint Ext. of F Bldg / Install Sec. Scrns
G Bldg |
33,200 |
| 185 |
16 14
|
Nuuanu El |
Repaint Int and Ext of Covered Gym |
44,800 |
| 186 |
17 01
|
Castle High |
Reconstruct Football Field -
Phase II |
50,000 |
| 187 |
17 02
|
Kailua High |
Install Security Screens |
6,800 |
| 188 |
17 03
|
Kanoelani El |
Repaint Interior of Cafeteria |
10,000 |
| 189 |
17 04
|
King Kam III El |
Remove Old Plygrnd & Install
New Plygrnd |
45,000 |
| 190 |
17 05
|
Lahainaluna High |
Replace Walkways & Clean A/C
Ducts |
25,000 |
| 191 |
17 06
|
Lehua El |
Repaint Int of Cafeteria & Replace
Stage Curtain |
27,500 |
| 192 |
17 07
|
Mililani High |
Replace Walkways Between L & M |
50,000 |
| 193 |
17 08
|
Nanakuli El |
Install Sprinkler System and
Landscaping |
22,500 |
| 194 |
17 09
|
Olomana El |
Renovate Portable Restrooms |
50,000 |
| 195 |
17 10
|
Pope El |
Paint Non-Skid Coating on Floors & Stairs |
30,000 |
| 196 |
17 11
|
Waiakeawaena El |
Repaint Interior and Exterior
of Cafeteria |
34,000 |
| 197 |
18 01
|
Aliamanu El |
Repaint Int Cafeteria / Install Screen Doors |
14,000 |
| 198 |
18 02
|
Iao Int |
Install Ground Sign & Security Gate |
31,700 |
| 199 |
18 03
|
Kahuku El |
Install Acoustical Tiles in Cafeteria |
9,000 |
| 200 |
18 04
|
Kahuku High & Int |
Replace Acoustical Tiles in Cafeteria & Band Room |
24,000 |
| 201 |
18 05
|
Kalihi El |
Reconstruct Upper Playcourt |
61,600 |
| 202 |
18 06
|
Kanoelani El |
Campus Install Sentricon |
7,500 |
| 203 |
18 07
|
King Int |
Repaint Int Gymnasium |
27,500 |
| 204 |
18 08
|
Maui Waena Int |
Repaint Ext Shop, Bldg A & Lath Bldg / Rpl Screen |
49,000 |
| 205 |
18 09
|
Mililani High |
Replace Handicap Ramp (Design Only) |
16,500 |
| 206 |
18 10
|
Momilani El |
Campus Install Sentricon |
3,000 |
| 207 |
18 11
|
Pearl City High |
Install Concrete Pad & Planters |
12,700 |
|
|
|
|
|
|
|
|
TOTAL
|
$5,926,402
|
|